Matrix Networks – Littleport Mushroom Factory

For Shropshire Energy Ltd

Littleport Mushroom Factory and 2.5 megawatt anaerobic digester – Completed September 2012

  • Excavation, reinstatement and installation of 4km of HV cables.
  • Open cut and directional drill crossings of the A10
  • River crossing at the Great River Ouse

Below shows the job in progress

11Kv Cable Joining
Directional Drill crossings of A10
Open Cut Cable Trench and Duct installation
11Kv Cable Winching in progress